
Rail Mounting Kit Hardware
• Eight #10-32 Screws
• Four each #8-32 Screws/Washers/Nuts
Spare Hardware PartsCheck with a JMR Sales Representative for pricing and availability of spare
hardware parts.
Description JMR Part Number
#10-32 Screw HDS-01580
#8-32 Screw HDS-00350
#8-32 Nut HDN-00040
#8-32 Washer HDW-00080
Rail Installation1. Affix the extension brackets to the main rail using the #8-32
screw/washer/nut assemblies. Adjust to the correct length for the cabinet
depth being used.
SSttoorrBBllaaddeeTM SCSI JBOD Installation Guide Rev A 6-2
StorBladeTM
Main Rail
Front
Expansion Rail
Rear
Front of
Rackmount
Unit
Two #8-32
Screws/Washers/Nuts
Two #10-32 Screws at
each end