John Lewis JLBIGH601 instruction manual Building In, Building over a kitchen unit with door, aSeal

Models: JLBIGH601

1 16
Download 16 pages 27.95 Kb
Page 11
Image 11
Building In

Building In

IMPORTANT: This hob must be installed acccording to the instruction supplied, and by qualified and competent personnel to the relevant National Standards.

Please ensure that when the hob is installed it is easily accessible for the engineer in the event of a breakdown.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the furniture unit, in order to avoid any contact with the bottom of the hob which can be heated when it is operated. The recommended solution is shown in diagram 3.

The panel fitted under the hob ("a") should be easily removable to allow easy access if technical assistance is needed.The space behind the kitchen unit ("b") can be used for connections.

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

It is also recommended to carry out the electrical connection to the hob as shown in diagrams 1 and 2.

Dimensions are given in mm

1

ON/OFF SWITCH

FLEX

 

OUTLET

 

 

FO

FO 2563

2564

ON/OFF SWITCH

2

FLEX

 

OUTLET

 

Fitting the Hob into the worktop

Carry out the building in of the hob as follows:

put the seals supplied with the hob, on the edges

￿of the cut out diagram 4, taking care that the seals meet without overlapping;

place the hob in the cut out, taking care that it is centred;

fix the hob with the relevant fixing clamps and screws, as shown in the diagram 5. When the screws have been tightened, the excess seal can be removed.

The edge of the hob forms a double seal which prevents the penetration of liquids.

FO 2098

4

 

3

FO 2044

5

aSeal

FO 0199

11

Page 11
Image 11
John Lewis JLBIGH601 Building In, Building over a kitchen unit with door, Building over a cupboard or drawer, aSeal