ACCESSORY KIT INSTALLATION MANUAL

THERMAL EXPANSION VALVE KITS

R-22S1-1TVM2**, 1TVM7** & R-410AS1-1TVM4**, S1-1TVM9**

FOR MODELS:

COILS - FC, MC, PC, UC, HD, HC, G4FA, G4FD & AIR HANDLERS - AH, AV, & F*FP

GENERAL INFORMATION

This thermal expansion valve (with internal check valve) is to be used with flex coils for models listed above. This kit is required to provide overall rated system performance improvement. The kit can be applied to the listed indoor coils and air handlers, both for heat pump and cooling applications.

The kit consists of a bolt-on thermal expansion valve, 2.5 feet of thermal insulation, bulb straps or bulb clamp and this instruc- tion.

When a TXV kit is installed, a hard start kit may be required. Consult your product data sheet.

Refer to Tabular Data sheet for specific model TXV/match-up.

1TVM2, 1TVM7 series TXV kits are R-22 AC and HP.

1TVM4, 1TVM9 series TXV kits are for R-410A AC and HP.

INSTALLATION

To install the thermal expansion valve, use the following steps. The coil will have to be pulled out of the casing for easy access.

1.Relieve the holding charge by pulling off the rubber cap plug on the suction manifold line of the coil.

ID coil is under 30 psig pressure.

2.After holding charge is completely discharged, loosen and remove the schraeder cap seal.

3.Loosen and remove distributor cap seal.

4.Install the thermal expansion valve to the orifice distributor assembly with supplied fittings. Orient the TXV as shown in Figure 1. Hand tighten and turn an additional

1/4 turn to seal. Do not overtighten fittings.

VAPOR

LINE

THERMAL

EXPANSION

VALVE BULB

(Cover completely

LIQUID

with insulation

LINE

provided)

THERMAL

EXPANSION

VALVE

TXV EQUALIZER LINE

DISTRIBUTOR BODY

FIGURE 1: Kit Installation in System

5.Install the liquid line to the top of the thermal expansion valve with fitting supplied with the liquid line. Hand modify the liquid line to align with casing opening. Hand tighten the liquid line and an additional 1/4 turn to seal.

6.Install the TXV equalizer line into the vapor line as follows:

a.Hand tighten the 1/4” SAE nut to the schraeder fitting and an additional 1/3 turn to seal.

7.Install the TXV bulb to the vapor line near the equalizer line, using the bulb clamp(s) furnished with the TXV assembly. Ensure the bulb is making maximum contact. See Figure 2 for proper bulb location. See Figure 3 for clamp assembly on 1TVM valve.

a.Bulb should be installed on a horizontal run of the vapor line if possible. The bulb should be installed on top of the line.

b.If bulb installation is made on a vertical run, the bulb should be located at least 16 inches from any bend, and on the tubing sides opposite the plane of the bend. The bulb should be positioned with the bulb tail at the top, so that the bulb acts as a reservoir.

c.Bulb should be insulated using thermal insulation pro- vided to protect it from the effect of the surrounding ambient temperature. Cover completely to insulate from air-stream.

8.Slide the coil in the cabinet and install the tubing connect plate. Soak the heat shield in water and slide it in place using the suction and liquid line holes provided.

9.Align the suction and liquid line sets to the suction and liq- uid tubing and wrap the liquid and suction tubing with wet rag before brazing.

Dry nitrogen should always be supplied through the tubing while it is being brazed, because the tempera- ture is high enough to cause oxidation of the copper unless an inert atmosphere is provided. The flow of dry nitrogen should continue until the joint has cooled. Always use a pressure regulator and safety valve to insure that only low pressure dry nitrogen is introduced into the tubing. Only a small flow is necessary to dis- place air and prevent oxidation.

All connections to be brazed are copper-to-copper and should be brazed with a phosphorous-copper alloy material such as Silfos-5 or equivalent. DO NOT use soft solder.

Nitrogen can be introduced through the Schraeder access (located at the OD unit connection of the refrigerant line). The Schraeder core can be removed before connecting the source of nitrogen, but should be reinstalled prior to the evacuation and charging of the refrigerant lines and ID coil.

Johnson Controls Unitary Products

166806-UAI-H-0408

Page 1
Image 1
Johnson Controls R-22 S1-1TVM2 installation manual Accessory KIT Installation Manual, Thermal Expansion Valve Kits