ASSEMBLY

NOTE: The strap hook must go through the discharge chute only. Do not allow the hook to enter the slot in the tractor back plate. This will allow the discharge chute to float with the mower deck when moving on uneven terrain.

DISCHARGE

CHUTE

HOOK

02306

BACKPLATE

SLOT

Fig. 4D

TO ASSEMBLE BAGGER (See Figs. 5A-5C)

Unfold bag by pivoting front bagger tube all the way forward and pressing the bottom vinyl binding onto the tube.

Inside the bag, install spreader bars and retainer springs onto pins on both sides of bag as shown.

Press the vinyl bindings onto the sides of front bagger tube.

Slide the bagger dump handle through the hole in the bagger top, install the clevis pin 10 x 44mm and secure with retainer spring.

FRONT BAGGER TUBE

5

 

90

 

02

VINYL BINDING

 

Fig. 5A

SPREADER BARS

RETAINER

SPRING

VINYL

BINDING

RETAINER SPRING

2906 0

Fig. 5B

Push cap over end of bagger dump handle.

NOTE: For future use, the clevis pin may be removed in order to use the handle to clear the chute in the event it has become clogged.

DUMP HANDLE

TUBE

CLEVIS PIN 10 X 44MM

RETAINER SPRING

CAP

907

02

Fig. 5C

BAGGER ADJUSTMENT (See Fig. 6 & 7)

For proper bag function and appearance, it may be nec- essary to adjust the bagger assembly. There should be 6mm (1/4")-9mm (3/8") gap between the bagger top and fender and the bagger top surface should be even with the top surface of the fender. To adjust bagger position:

HORIZONTAL ADJUSTMENT

Slightly loosen the nuts securing the bagger RH and LH horizontal adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.

Move the brackets the amount forward or backward you wish the bag assembly to move. Retighten the nuts securely.

VERTICAL ADJUSTMENT

Slightly loosen the nuts securing the vertical adjust- ment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.

Move the brackets the amount up or down you wish the bag assembly to move. Retighten the nuts securely.

Reinstall the bagger assembly and check the bagger to fender fit. If necessary, repeat the procedure until proper fit is attained.

 

6MM (1/4") - 9MM (3/8")

HORIZONTAL

TOP SURFACES

EVEN

ADJUSTMENT

 

BRACKET

 

 

VERTICAL

Fig. 7

ADJUSTMENT

 

 

BRACKET

 

 

02967

BAGGER

LATCH

Fig. 6

8

Page 8
Image 8
Jonsered LT2220 CMA2 To Assemble Bagger See Figs A-5C, Bagger Adjustment See, Horizontal Adjustment, Vertical Adjustment