3. Lay the Bed (8) on the ground inside of the



8

Frame

 

 

 

assembled frame. Make sure that the two warn-

 

 

V-rings

 



 

 

 

ing decals (not shown) are on top of the Bed.

 

 

 

 

 



 

 

10

 

Note: There are V-rings aroundthe edge of the

 

10

 

10

Bed (8) and holes around the top of the frame.

 

 

 

 

10

During this step, you will attach the Bed to the

 

 

 

frame using the included Springs (10) for holes

 

 

 

 

on top of frame and for holes on bottom of frame

 

 

 

 

(see the inset drawing). Hook a spring to the

 

 

Holes

 

Bed(8) and using the spring pulling tool(22), pull

 

 

 

 

 

 

 

the spring from the Bed to the hole slot in the

 

 

 

 

trampoline frame with even spring tension.

 

 

 

 

Be careful where you place your hands, the

 

 

 

 

Springs and frame joints can pinch.

 

 

 

 

To attach each Spring, you will first hook one end

 

 

 

 

of the Spring into a V-ring with black webbing

 

 

 

 

with yelow line location (see the inset drawing).

 

 

 

 

No yellow line

 

 

 

22

 

 

 

 

 

Black webbing with yellow line

 

 

 

 

Hook the first two Spring(10) into two the V-rings

 

 

 

 

(black webbing with yellow line) on the Bed(8) and

 

 

 

 

into the holes on the top tube. Attach two more

 

 

 

 

Springs (10) with black with yellow line location

 

 

 

 

directly across the Bed (with the webbing) from the

 

 

Springs (10)



first two Spring. Attach two

more Spring(10) with

 

 

black webbing with yellow line location halfway

 

 

Hook the V-ring

 

between the first/second Spring(10), so eight

 

 

 

 

 

 

 

Springs(10) are attached as shown. Attach four

 

 

 

 

more Springs(10) (not shown) halfway between

 

 

 

 

the first eight Springs(10). Continue attaching

 

 

 

 

Springs(10) halfway between the previously attached

 

 

 

 

Springs,until all the Springs are attached.

 

 

 

 

During the installation of springs, wear

 

 

 

 

gloves and protective eye wear.

 

 

V-ring

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

10

 

 

 

 

 

8

Frame

 

 

 

 

 

 

 

16 

 

 

 

Page 15
Image 15
Jumpking YJ manual Hook the V-ring