■Ensure that your working area is free of possible sources of danger, for example don’t leave any tools lying around. Al- ways dispose packaging material in such a way that it may not cause any danger. There is always a risk of suffocation if child- ren play with plastic bags!
■The fastening material required for each assembly step is sho- wn in the diagram inset. Use the fastening material exactly as instructed. The required tools are supplied with the equipment.
■Bolt all the parts together loosely at first, and check that they
have been assembled correctly. Tighten the locknuts by hand until resistance is felt, then use spanner to finally tighten nuts completely against resistance (locking device). Then check that all screw connections have been tightened firmly. Attention: once locknuts have been unscrewed they no longer function correctly (the locking device is destroyed), and must be repla- ced.
■For technical reasons, we reserve the right to carry out preli- minary assembly work (e.g. addition of tubing plugs).
List of spare parts page 10-12
When ordering spare parts, always state the full article number,
Example order: Art. no.
/2 pieces / control number/ S/N .................... Please keep original packaging of this article, so that it may be used for trans- port at a later date, if necessary.
Important: spare part prices do not include fastening material; if fastening material (bolts, nuts, washers etc.) is required, this
should be clearly stated on the order by adding the words „with fastening material“.
KETTLER International Inc.
P. B. 2747 · Virginia Beach · VA
3