INSTALLATION REQUIREMENTS

Tools and Parts

Gather the required tools and parts before starting installation. Read and follow the instructions provided with any tools listed here.

Tools needed

Tape measure

Marker or pencil

Flat-blade screwdriver

Masking tape

Phillips screwdriver

Pipe-joint compound

Level

 

resistant to LP gas

Noncorrosive leak-detection

Hand or electric drill

 

solution

 

Wrench or pliers

 

Stud finder

 

 

Pipe wrench

¹⁵⁄₁₆" combination wrench

Parts needed

A UL listed or CSA approved conduit connector

UL listed wire connectors

Parts supplied

Check that all parts are included.

Anti-tip bracket kit

 

1"

1¾"

 

(4.4 cm)

 

(2.5 cm)

 

 

A

 

B

C

A. Anti-tip bracket - 1" (2.5 cm)

B. Anti-tip bracket - 1¾" (4.4 cm)

C. #10 x 2" Phillips head mounting screws (2)

NOTE: Anti-tip brackets must be securely attached to wall stud. Thickness of finished wall may require longer mounting screws to anchor bracket to wall. Longer mounting screws are available from your local hardware store. See “Install Anti-Tip Bracket” section.

Backguard and attachment screws (7).

NOTE: The backguard included with the range is required if installed with less than 5" (12.7 cm) clearance from a combustible rear wall.

Island trim and attachment screws (3).

NOTE: The island trim included with the range may be used if installed with 5" (12.7 cm) clearance from a combustible rear wall or with 0" (0.0 cm) clearance from a noncombustible rear wall.

LP conversion kit

NOTE: The cooktop is manufactured for use with Natural gas. To convert to LP gas, see the gas conversion instructions provided in the package containing literature.

Check local codes and consult gas supplier. Check existing gas supply and electrical supply. See “Electrical Requirements” and “Gas Supply Requirements” sections.

All electrical connections should be made by a licensed, qualified electrical installer.

Location Requirements

IMPORTANT: Observe all governing codes and ordinances. Do not obstruct flow of combustion and ventilation air.

It is the installer’s responsibility to comply with installation clearances specified on the model/serial rating plate. The model/serial rating plate is located on the right vertical surface of the oven door frame.

It is recommended that a 600 CFM range hood be installed above the range.

Recessed installations must provide complete enclosure of the sides and rear of the range.

To eliminate the risk of burns or fire by reaching over heated surface units, cabinet storage space located above the surface units should be avoided. If cabinet storage is to be provided, the risk can be reduced by installing a range hood that projects horizontally a minimum of 5" (12.7 cm) beyond the bottom of the cabinets.

All openings in the wall or floor where range is to be installed must be sealed.

Do not seal the range to the side cabinets.

Cabinet opening dimensions that are shown must be used. Given dimensions are minimum clearances.

The wall anti-tip bracket must be installed. To install the anti- tip bracket shipped with the range, see “Install Anti-Tip Bracket” section.

Grounded electrical supply is required. See “Electrical Requirements” section.

Proper gas supply connection must be available. See “Gas Supply Requirements” section.

4

Page 4
Image 4
KitchenAid Dual Fuel Convection Range Installation Requirements, Tools and Parts, Location Requirements