12.Test the operation of the hood before moving on to next step. Make sure powe supplied to the hood.
Duct Cover Installation
13.Using Table 1 and measurements on page 12 for references, mark the leveling p duct
14.Secure the duct
15.Hook the inner duct cover onto the duct
Figure 10 | Figure 11 |
Final Assembly
16.Turn power ON in control panel. Check all lights and blower operation.
17.Make sure to leave this manual for the homeowner.
7