Kobe Range Hoods RA3836SQ installation instructions Under The Cabinet Installation, Safety Warning

Models: RA3836SQ

1 24
Download 24 pages 3.27 Kb
Page 7
Image 7
UNDER THE CABINET INSTALLATION

UNDER THE CABINET INSTALLATION

SAFETY WARNINGSAFETY WARNING

HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF IT IS NECESSARY TO REMOVE ANY PARTS FOR INSTALLING, CLEANING, OR SERVICING.

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

-Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1.

-Temporarily wire the hood to test for proper operation before installing.

-Peel protective film off the hood (if any).

-For installing under the cabinets with recessed bottom, attach 4-inch wide wood filler strips (not included) on each side. Refer to Figure 2.

-Measure and create access opening for electrical wires under the cabinet.

Figure 1

Figure 2

Hood Installation

CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE.

1.Puncture the knockout holes. Refer to Figure 3.

Figure 3

5

Page 7
Image 7
Kobe Range Hoods RA3836SQ installation instructions Under The Cabinet Installation, Safety Warning