![2. Install the Lavatory](/images/new-backgrounds/40162/401627x1.webp)
|
| 1/8" (3mm) Thick | |
1/8" (3mm) Thick | 3/8" (1cm) | Bead of Sealant | |
Bead of Sealant |
| ||
| (TYP.) |
| |
1/4" | 3" (7.6cm) |
| |
|
| ||
(6mm) | Rim of |
| |
|
| ||
Lavatory |
| ||
(3.5cm) |
|
| |
3" (7.6cm) | |||
Hole |
| ||
Hole |
| ||
|
2. Install the Lavatory
Cut out the opening by carefully following the pencil line traced from the template.
CAUTION: Risk of personal injury or product damage. Handle with care. Vitreous china can break or chip if the product is handled carelessly.
Temporarily set the lavatory into the countertop cutout to check for ®t.
Remove the lavatory from the countertop cutout.
Install the
K-2271
NOTE: Do not substitute another sealant for the one provided. The supplied sealant is required to permanently bond the lavatory to the countertop.
Apply two 1/8² (3mm) beads of sealant around the countertop
Set the lavatory into the countertop cutout. Use care to avoid smearing the sealant beads.
4 | Kohler Co. |