￿￿￿￿ ￿￿￿￿￿￿ ￿N￿T￿￿

Determine the desired location of the case drawer unit.

Measure down 3(1/8" from where the top edge of the case drawer will be located and 2(1/2" in from where the left edge will be located. Make a mark at this point.

While holding the cleat with the largest side facing away from the wall, align the left hole in the cleat with the mark on the wall.

Make sure cleat is level and predrill holes into the wall to align with the holes in the cleat. Use a drill of adequate diameter to accommodate fasteners (not provided).

Secure cleat to wall with fasteners (not provided).

￿￿￿￿￿￿￿￿ ￿￿T￿￿￿L ￿N￿T￿￿

Determine the desired location of the drawer unit.

Measure down 3(1/8" from where the top edge of the storage unit will be located and 2(1/2" in from where the left edge will be located. Make a mark at this point.

While holding the cleat with the largest side facing away from the wall, align the left hole in the cleat with the mark on the wall.

Make sure cleat is level and predrill holes into the wall to align with the holes in the cleat. Use a drill of adequate diameter to accommodate fasteners (not provided).

Secure cleat to wall with fasteners (not provided).

2!1/2"Cleat

3!1/8"

Case Drawer Unit

2!1/2"

Cleat

3!1/8"

2!Drawer Vertical Unit

AA

(C)

2

Kohler Co., Kohler, WI

86217!2!

 

 

Page 2
Image 2
Kohler K-3106-F2 manual Tl Nt