
3DRWER UNITS
Determine whether you have a horizontal or vertical drawer unit. Check orientation of large drawer to verify.
NOTE:When installing a horizontal unit the large drawer must be installed on the left*hand side.
Determine the desired location of the drawer unit.
Cleat2"1/2"
Horizontal Drawer Unit
3"1/8"
easure down 3*1/8" from
where the top edge of the drawer unit will be located and 2*1/2" in from where the right edge will be located. ake a mark at this point.
While holding the cleat with the largest side facing away from the wall, align the right hole in the cleat with the mark on the wall.
ake sure cleat is level and predrill holes into the wall to align with the holes in the cleat. Use a drill of adequate diameter to accommodate fasteners (not provided).
Secure cleat to wall with fasteners (not provided).
Cleat
2"1/2"
3"1/8"
Vertical Drawer Unit
Kohler Co., Kohler, WI | 3 | 86217"2" | AA | (C) |
|
|