Kuppersbusch USA IKD 1157.1 GE-UL installation instructions Installation with output vent, Pag

Models: IKD 1157.1 GE-UL

1 9
Download 9 pages 11.25 Kb
Page 7
Image 7
Installation with output vent

Manual ND ISLA UL ing.qxd 6/05/2003 11:50 PÆgina 7

Installation

On installing the kitchen hood make sure that the Safety Instructions set out on page 2 are complied with.

WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS, OBSERVE THE FOLLOWING:

a. Installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards, including fire-rated construction.

b. Sufficient air is needed for proper combustion and exhausting of gases through the flue (chimney) of fuel burning equipment to prevent back drafting. Follow the heating equipment manufacturer´s guideline and safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), and the local code authorities.

c. When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities.

d. Ducted fans must always be vented to the outdoors.

WARNING: TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.

WARNING: To Reduce The Risk Of Fire Or Electric Shock, Do Not Use This Fan With Any Solid-State Speed Control Device.

To obtain optimum performance, the external conduct must not be more than FOUR METRES LONG, have more than two 90° angles and its diameter must be at least Ø120.

 

Installation with output vent

 

 

Fig. 1 (Pag. 8)

 

 

1) Using the support (O), trace and drill the

 

 

points for fitting the lock screws (S) (Ø8 x 45)

 

 

onto the ceiling.

 

ENG

2) Screw the support (O) into the ceiling with

 

 

 

the lock screw (S) (Ø8 x 45).

 

 

 

 

3) Mount the top inner body (A6) in the

 

 

support (O) with the screws (Q) (M6 x 16).

 

 

4) Softly attach the decorative handle (W) to

 

 

the decorative glass part (U) with the screws

 

 

(X) (M5) and the washers (Y) provided with

 

 

the glass.

 

 

5) Adjust the decorative glass part (U), fixing

 

 

it to the body of the kitchen hood using the

 

 

screws (V) (M4) provided with the glass.

 

 

6) Fit the part (A) if the inner tube (not

 

 

supplied) is Ø150 or (A) + (B) if it is Ø120.

 

 

7) Attach the inner tube with a clamp (not

 

 

supplied) to (A) or (B) as the case may be.

 

 

8) Introduce the upper tubecover (A8) into the

 

 

lower tubecover (A9).

 

 

9) Adjust the group lower tubecover (A9) and

 

 

upper tubecover (A8) to the bottom inner body

 

 

(A7) and to the decorative glass wing (U).

 

 

10) Mount the bottom group to the top, fixing

 

 

it to the ceiling with the screws (A10) (M4 x

 

 

12) to the desired height.

 

 

11) Fit the top part of the inner tube (not

 

 

supplied) to the output vent.

 

 

12) Lift the upper tubecover (A8) up to the

 

 

desired height and fix it to the top group with

 

 

the screws (G) (M4 x 12, flat head).

 

 

13) Adjust finally the decorative glass part (U),

 

 

fixing it to the body of the kitchen hood using

 

 

the screws (V) (M4) provided with the glass.

 

 

7

Page 7
Image 7
Kuppersbusch USA IKD 1157.1 GE-UL installation instructions Installation with output vent, Pag