FACING
IMPORTANT
The facade must be removable once installed. The facade is designed to overlap any facing material installed on the front of the fireplace. If thicker material is installed, use the facade as a template and make sure it can be easily removed for servicing.
1.Combustible material must be installed flush with the fireplace. It may not project in front of and on the fireplace (i.e. the steel facade of the fireplace) (Figure 14).
2.
MANTEL & FACING
The mantel must be installed at least 56” (1143 mm) above the base of the fireplace (Figure 13).
Fireplace Frame Section
(Top View)
13
4
5
26
3
1 | 4 |
|
7
2
1.Fireplace
2.Front of fireplace
3.Wood frame (2” x 3” min)
4.Drywall
5.Tiles
6.Rock board or other
7.Brick
Figure 12
10
| Mantel & Facing |
| (Side View) |
| Drywall |
Mantel | 2” X 3” Min. |
| Spacer |
56” | ... |
| |
Rock Board |
|
or Other |
|
Noncombustible | |
Facing |
|
Figure 13
Only
50”
Min.
Figure 14
Noncombustible Facing
Drywall
2” X 3” Min.
Spacer
Figure 15
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Fireplace Blower
The fireplace comes equipped with a heat activated blower. It is located in the bottom of the fireplace, towards the back. It uses 120V and must be connected to the main electrical circuit by a qualified electrician. For connection, use the electrical box supplied with the unit located on the bottom right corner of the fireplace.
If you wish to adjust the blower speed, the variable speed control (VRUW) provided must be installed in line with the wiring. Again, use a qualified electrician for installation.
If the blower requires servicing,
1- Remove the doors and decorative facade.
2- Remove the screw located below the blower motor that holds it to the back of fireplace.
3- Pull the blower out of the unit through the square hole located in the front bottom right corner.
HOT AIR DUCTING INSTALLATION
The Montecito Estate™ is approved for use with a Gravity Kit:
Gravity Kit
The gravity kit is designed for double hot air outlets and includes:
(See Figure 16)
-2 telescopic lengths 8” I.D.
-2 90º elbows 8” I.D.
-2 hot air outlet kits (grill and frames)
-2 adaptors
See Gravity Kit Accessories on Page 20.
Only the blower available with the fireplace can be used with the gravity kit.
For safe installation, the gravity kit must meet the following requirements:
Minimum height* 68” (1,727 mm) Maximum length See Figure 17
*The height of the louver must be measured from the base of the Montecito Estate to the middle point of the louver.