Table 25. Removal steps of base cover assembly for ThinkPad X200s
ThinkPad X200s:
Remove the top shielding assembly at first.
2
1
Step Screw (quantity) Color Torque

1 M2 × 3 mm, wafer-head, nylon-coated (1) Black 0.181 Nm

(1.85 kgfcm)

3
Step Screw (quantity) Color Torque

3 M2 × 3.5 mm, wafer-head, nylon-coated (1) Black 0.181 Nm

(1.85 kgfcm)

98 ThinkPad X200 and X200s Hardware Maintenance Manual