12 Room Air Conditioner
Installation
Installation Kits Contents
NO. NAME OF PARTS Q'TY
1 FRAME CURTAIN 2
2 SILL SUPPORT 2
3 BOLT 2
4 NUT 2
5 SCREW(TYPE A) 13
6 SCREW(TYPE B) 3
7 SCREW(TYPE C) 5
8 FOAM-STRIP 1
9 FOAM-PE 1
10 FRAME GUIDE 2
11
WINDOW LOCKING BRACKET
1
12 3 4
8 9
765
1
9
5
5
5
10
10
EPS Material
Upper guide
(Type A)
(Type A)

Suggested Tool Requirements

PREPARATION OF CHASSIS

1.Remove the screws which fasten the cabinet
at both sides and at the back.
2.Slide the unit from the cabinet by gripping the
base pan handle and pulling forward while
bracing the cabinet.
3.Remove EPS Material.
4.Cut the window sash seal to the proper
length.Peel off the backing and attach the
foam-pe to the underside of the window
sash.
5. Insert the frame guides into the bottom of
the cabinet.
6. Insert the Frame Curtain into the upper
guide and frame guides .
7. Fasten the curtains to the unit with 4 Type A
screws.
SCREWDRIVER(+,-), RULER, KNIFE, HAMMER, PENCIL, LEVEL
0
1
1
10
10
(The EPS Material protected the unit when transitting.
You can disuse itafter remving it