Rack Installation

Typical Rack Installation

1.(Optional) As shipped, the OAT100R mounting brackets are attached flush with the front of the unit (see diagram a). If desired, the mounting brackets may be detached from the unit and reattached, for example, so that they are flush with the rear of the unit (see diagram b). If you wish to change the location/orientation of the mounting brackets, carefully remove each of the four (M4 x 10 mm) screws and attendant washers (one flat and one lock washer per screw) holding each bracket in place. Then, use the same screws and washers to reattach the mounting brackets in the desired location.

2.Carefully slide the chassis into a standard 19-inch equipment rack.

3.Use all four mounting screws to secure the chassis to the rack.

(a)

PWR

STATUS

SERVICE

 

PORT

To rack

To rack

(b)

RF-OUT

RF-IN 8

RF-IN 7

 

 

 

 

 

 

 

 

 

 

 

 

RF-IN 6

RF-IN 5

 

 

 

 

 

 

 

 

 

 

 

 

RF-IN 4

RF-IN 3

 

 

 

 

 

 

 

 

 

 

 

 

RF-IN 2

RF-IN 1

 

 

 

 

 

 

 

 

 

 

 

 

Feature Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Port

Port

POWER

 

 

 

 

 

 

 

 

 

 

 

 

12V

Use flat washer and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

lock washer with each

 

 

 

 

 

 

 

 

 

 

 

 

M4 x 10 mounting

 

 

 

 

 

 

 

 

 

 

 

 

bracket screw.

12

206-4218