Rack Installation (Cont.)
Front View
of Rack Cabinet
1 inch minimum
SERVICE
PWR STATUS PORT
1 inch minimum
A. Elevated Operating Ambient
If installed in a closed or
B.Reduced Air Flow
Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised. To ventilate the system normally and avoid overheating, leave at least 1 inch (2.5 cm) on each side (including top and bottom) of the OAT100R. Do NOT stack other equipment on the top of the OAT100R. Also, ensure that the unit’s AC power adapter is never stacked or bundled with other AC power adapters. Each adapter should have adequate ventilation and should be isolated from other heat sources.
C.Circuit Overloading
Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring.
D.Reliable Earthing
Maintain reliable earthing of
E.Mains Outlet Earthing
The apparatus with Class I construction must be connected to a mains socket outlet with a protective earthing connection.