![](/images/backgrounds/227811/bge.png)
14
0123456
1/2 1/2 1/2 1/2 1/2 1/2
STEP 17:
FIGURE 17• Screw the threaded end of the ARM CURL CABLE (11) into threaded housing on the base of BASE (1) and
tighten jam nut securely.
1
11
3
14
• Slide the SHROUD (14) between the TOWER (3) as shown in FIGURE 17.
• SECURELY tighten the bolts of the PULLEY BLOCK ASSEMBLY.