17 3/8 X |
|
| 2 |
| 22 |
| 22 |
27 | 11 |
| 21 |
| 10 |
FIGURE 5 |
|
STEP 5:
•Insert one 2 X 3” END CAP (27) into the TOP BOOM (2) as shown in FIGURE 5.
•Route threaded end of the LAT CABLE (11) through the TOP BOOM (2) as shown in FIGURE 5.
•SECURELY assemble three
CABLE (11) IS IN THE GROOVES OF THE PULLEYS.)
8