10
0123456
1/2 1/2 1/2 1/2 1/2 1/2
STEP 7:
• Assemble the PRIMARY PIVOT (9) of the PRESS ARM ASSEMBLY to the top of the FRAME (1) using 1/2 X 8-3/4” BOLT (33),
two 1/2” FLAT WASHERS (37) and 1/2” LOCK NUT (58).
• SECURELY TIGHTEN ALL FRAME CONNECTION BEFORE PROCEEDING TO NEXT STEP
33
37
58
48
1
1/2 X 8-3/4”
SECURELY
TIGHTEN
SECURELY TIGHTEN top of both SHAFT COLLARS (48) flush to bottom of both BOOM PLATES (4),(5)
40
FIGURE 7
• Insert 3/4 x 4” SHAFT (40) into both 3/4” FLANGE BEARINGS on FRAME (1)