SM41 Unpacking & Assembly Instructions
13
LAT PULLDOWN CABLE ROUTING
Route the lat pulldown cable as shown in Figure 17. Screw the cable into the weight stack as
shown in Figure 18.
Figure 17. Lat pulldown cable routing.
Bolt the cable to the weight stacks as shown in Figure 18. Thread the 7/8” nut up on the
cable bolt as shown at left. Screw the bolt down into the weight stack as shown at right.
Tighten the bolt with a 7/8” combination wrench.
Figure 18. Screw the cable into the weight stack.