SM81 Unpacking & Assembly Instructions
6
Figure 4. Bolt on the teardrop pulleys.
Figure 5. Configuration for 2-3/4” and 3” bolts.
3. Using a 5/8” socket with extension and combination wrench, bolt on the connecting
beam to the cubes using two of the large 7/16” x 6” bolts, 7/16” washers, and 7/16”
nuts, end cap washers and end caps. Figure 6 shows the connected cubes.