SM81 Unpacking & Assembly Instructions
7
4. Using a 5/8” socket and combination wrench, mount the 56” lat tops (part T from
HARDWARE section) to the cells by inserting two of the large 7/16” by 6” bolts using
the hardware configuration shown in Figure 7. Mount the 29” tricep top (part U in
HARDWARE section) and adjustable crossover top (part V in HARDWARE section)
to the frame and connecting beam (See Figure 6). You will need to remove the
pulleys from the teardrop pulley assemblies to gain clearance for the socket wrench
extension. Leave the pulleys out of the housings until the cables have been installed.
7/16” x 6” (8)-
mount on tops
3/8” x 3” (4)-
bolt top
beams together
T
T
U
U
Remove pulleys from
housings to give clearance
to socket extension
Figure 6. Mount lat tops and tricep tops.
Figure 7. Configuration for 6” bolts.