Lightolier 1101FIC, 100IFIC instruction sheet WIRE-IN Fig. B, SWING-UP Fig. C, CLOSE-IN Fig. D

Models: 100IFIC 1101FIC

1 2
Download 2 pages 18.39 Kb
Page 2
Image 2

Page of 2

2.  WIRE-IN (Fig. B)

Open hinged J-BOX COVER fully to its locked position (lift slightly to unlock).

Open hinged KNOCK OUT to allow NON-METALLIC CABLE to enter JUNCTION BOX. Push CABLE through CLAMP.

Note: Wiring and connections must not be placed in JUNCTION BOX in a manner which will interfere with the CLAMPS action to provide strain relief.

Wire to SUPPLY LEADS. WHITE FIXTURE LEAD to NEUTRAL SUPPLY LEAD. BLACK FIXTURE LEAD to HOT (120V) SUPPLY LEAD. BARE FIXTURE WIRE to SUPPLY GROUND. Use wirenuts (local hardware item). Place all electrical con- nections in the J-BOX and close the J-BOX COVER.

3.  SWING-UP (Fig. C)

Extend MOUNTING BAR to reach opposite joist and fasten in place. Adjust to desired position along MOUNTING BAR and lock in place using

LOCKING SCREW.

4.  CLOSE-IN (Fig. D)

Install plasterboard or other dry type ceiling. Hole in board can be cut either on the floor or after the board is secured to the ceiling using MOUNTING FRAME opening as cutting guide. Make sure spring clips are rotated out of hole area to be cut, also making sure that socket and wiring are positioned away from hole area. Spring clips can only be rotated counterclockwise. This detail allows easy removal of reflector trim by rotating TRIM counterclock- wise and permits installing Reflector Trim tightly against the ceiling surface by rotating trim clockwise after pushing Trim into ceiling.

5.  AIRSEAL® INSTALLATION (optional)

Install a bead of silicone caulking compound between the ceiling opening and edge of HOUSING. Housings are tested in accordance with ASTM E 283 (max 2 cfm @ 75 pa) and comply with WSEC & IECC when installed as instructed.

6.  SNAP-ON (Fig. E)

 

Important - Insert SOCKET CUP in

 

neck of REFLECTOR making sure

See Separate

SPRING TABS fully engage into SLOTS

in REFLECTOR.

Reflector Trim

7.  PUSH-UP (Fig. F)

Instruction

Push REFLECTOR TRIM straight up

}Sheets

until it is tight against ceiling.

 

8.  BALLAST REPLACEMENT

A qualified electrician must perform ballast replacement. Turn off power. Remove reflector trim from luminaire. Remove fasteners that secure the bal- last to the housing. Remove ballast assembly through ceiling hole. Disconnect all input wiring to the ballast. Release all wires from ballast wire connectors by inserting small blade tool with insulated handle into wire release slots (Figure H). Remove ballast and replace with new ballast. Rewire, see label on ballast for wiring diagram then reassemble.

Instruction Sheet Number  1101FIC

Installation Procedure for High Wattage Insulated Ceiling Frame-In Kits 100IFIC, 1101FIC, 2001FIC

non-metallic

j-box cover

sheathed cable

 

(12 or 14 gauge only)

 

hinged knock out

cable clamp

junction box

 

deform material at any

 

corner of frAmE for addi-

Locking screw

tional lock IF NEEDED

 

RT

REMOvE

INSE

 

WIRE RELEASE

BLAdE

(By OTHERS)

WIRE RELEASE

SLOTS

BALLAST WIRE

CONNECTORS

Figure H

U.S. and Foreign Patents Pending

 

Lightolier a Genlyte company

www.lightolier.com

631 Airport Road, Fall River, MA 02720 • (508) 679-8131 • Fax (508) 674-4710 We reserve the right to change details of design, materials and finish.

© 2007 Genlyte Group LLC • B0607

Page 2
Image 2
Lightolier 1101FIC, 100IFIC WIRE-IN Fig. B, SWING-UP Fig. C, CLOSE-IN Fig. D, Airseal Installation optional