2. WIRE-IN (Fig. B)
Open hinged
Open hinged KNOCK OUT to allow
Note: Wiring and connections must not be placed in JUNCTION BOX in a manner which will interfere with the CLAMPS action to provide strain relief.
Wire to SUPPLY LEADS. WHITE FIXTURE LEAD to NEUTRAL SUPPLY LEAD. BLACK FIXTURE LEAD to HOT (120V) SUPPLY LEAD. BARE FIXTURE WIRE to SUPPLY GROUND. Use wirenuts (local hardware item). Place all electrical con- nections in the
3. SWING-UP (Fig. C)
Extend MOUNTING BAR to reach opposite joist and fasten in place. Adjust to desired position along MOUNTING BAR and lock in place using
LOCKING SCREW.
4. CLOSE-IN (Fig. D)
Install plasterboard or other dry type ceiling. Hole in board can be cut either on the floor or after the board is secured to the ceiling using MOUNTING FRAME opening as cutting guide. Make sure spring clips are rotated out of hole area to be cut, also making sure that socket and wiring are positioned away from hole area. Spring clips can only be rotated counterclockwise. This detail allows easy removal of reflector trim by rotating TRIM counterclock- wise and permits installing Reflector Trim tightly against the ceiling surface by rotating trim clockwise after pushing Trim into ceiling.
5. AIRSEAL® INSTALLATION (optional)
Install a bead of silicone caulking compound between the ceiling opening and edge of HOUSING. Housings are tested in accordance with ASTM E 283 (max 2 cfm @ 75 pa) and comply with WSEC & IECC when installed as instructed.
6. |
|
Important - Insert SOCKET CUP in |
|
neck of REFLECTOR making sure | See Separate |
SPRING TABS fully engage into SLOTS | |
in REFLECTOR. | Reflector Trim |
7. | Instruction |
Push REFLECTOR TRIM straight up | }Sheets |
until it is tight against ceiling. |
|
8. BALLAST REPLACEMENT
A qualified electrician must perform ballast replacement. Turn off power. Remove reflector trim from luminaire. Remove fasteners that secure the bal- last to the housing. Remove ballast assembly through ceiling hole. Disconnect all input wiring to the ballast. Release all wires from ballast wire connectors by inserting small blade tool with insulated handle into wire release slots (Figure H). Remove ballast and replace with new ballast. Rewire, see label on ballast for wiring diagram then reassemble.
Instruction Sheet Number 1101FIC
Installation Procedure for High Wattage Insulated Ceiling
sheathed cable | ||
| ||
(12 or 14 gauge only) |
|
hinged knock out | cable clamp |
junction box
| deform material at any |
| corner of frAmE for addi- |
Locking screw | tional lock IF NEEDED |
| RT |
REMOvE | INSE |
|
WIRE RELEASE
BLAdE
(By OTHERS)
WIRE RELEASE
SLOTS
BALLAST WIRE
CONNECTORS
Figure H
U.S. and Foreign Patents Pending |
|
Lightolier a Genlyte company | www.lightolier.com |
631 Airport Road, Fall River, MA 02720 • (508)
© 2007 Genlyte Group LLC • B0607