B.CLOSE-IN
1.install plasterboard or other dry tape ceiling, aa required. Hole in board can be cut either on the floor or after the board ie nailed to the ceiling, using MOUNTING FRAME opening es cutting guide. (Make sure ROTO CLIPS are roteted out of hole area).
2.Cut hole in ceiling for SWITCH/lNDICATOR
LIGHT BOX in a convenient location to the eide or end of frame (Fig. 9). The recommended hole siza is 2%”x3%’!
3.
4.Pull down SWITCH/lNDICAIOR LIGHT BOX (Fig.
9)and clamp on to ceiling by tightening
SCREWS on side of box (Fig. 9).
5.Connect UNIT CONNECTOR in SWITCH BOX (Fig. 9).
6.Faetan TRIM PLATE t~ SWITCH BOX with NUT prcvided (Fig. 10).
C.PULL THRLf SEE SEPARATE
~ D. | REFLECTOR TRIM | |
INSTRUCTION | ||
| ||
E. | } SHEET | |
|
lS:ll~TM
oae2
Page 3 of 4
SCREWS
f
p
UNIT CONNECTOR
m.e
L eWITCHilNDICATOR
LIGHT aOX
7+ TRIM
e
FIG. 10
F.OPERATION
When AC powar is applied, the charging indicator light is illuminated, indicating that tha battery is being charged. When the powar fails, the emergency lightin ballast automatically ewitches to amargency operation, keeping one lamp on reduced output 7or 90 minutes.
G. MAINTENANCE
Although no routine maintenance is required to keep the emargency lighting ballast functional, it should be checked periodically to ensura that it is working. The following schedula is recommended
1. Visually inspect the charging indicator light monthly. It should be illuminated.
2. Test the emergency operation of fixture onca every 3 months. One lamp should OperSte at redUC- ed output.
3. Conduct a 90 minute discharge test once a year. One lamp should operate at reduced output for
““m‘1
90 minutes.