Lightolier 1104FESR instruction sheet Frame-In Wire-In, Frame-In Fig. a, Close-In Snap-On

Models: 1104FESR

1 2
Download 2 pages 55.72 Kb
Page 1
Image 1

 

Instruction Sheet Number  1104FES

Page  of 2

Installation Procedure for Convertible IC/Non IC Frame-In-Kits

Read and understand these instructions before installing fixture.

This fixture is intended for installation in accordance with the National Electrical Code and local regulations. To assure full compliance with local codes and regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.

Retain these instructions for maintenance reference.

Warranty information on back – retain this sheet.

Installation Procedure for Convertible IC/Non IC

Frame-In-Kits 1104F13ES/18ES/26ES and 1004F13ES/18ES/26ES

Frame-In-Kits 1104F13RES/18RES/26RES and 1004F13RES/18RES/26RES

1104 Series FIK Use 1100 Series Trims (Finishing Sections) Only

1004 Series FIK Use 1000 Series Trims (Finishing Sections) Only

New Construction

Fig. A

Fig. B

Fig. C

Frame-In

Wire-In

Swing-Up

1.Frame-In (Fig. A)

Locate fixture along joist and line up bottom edge of hinged mounting bar with the bottom of joist and fasten in place.

Hinged Mounting Bar

3” 1004IC 3 3/4” 1104IC

Fig. D

Fig. E

Fig. F

Close-In

Snap-On

Push-Up

For suspended ceilings:

Rotate hinged bar ends to position shown below and fully extend bars.

Crimp bottom of edge of channel to prevent rotation of hinged bar ends.

Bend NON-HINGED end of mounting bar at featured hole location and extend out.

Position notched area of mounting bars onto t-bar and lock by bending tab underneath t-bar bead as shown.

tab

BEND AT HOLE

5 1/4” 1004IC

t-bar

BEND TAB TO LOCK

6 1/4” 1104IC

2.Wire-In (Fig. B)

Open hinged J-Box Cover fully to its locked position (lift slightly to unlock).

Open hinged Knock Out to allow Non-Metallic Cable to enter Junction Box. Push Cable through Clamp.

Note: Wiring and connections must not be placed in junction box in a manner which will interfere with the clamps action to provide strain relief.

Wire to supply leads. White fixture lead to neutral supply lead. Black fixture lead to hot (120V) supply lead. Bare fixture wire to supply ground. Use wirenuts (local hardware item). Place all electrical connections in the J-Box and close the J-Box cover.

3.Swing-Up (Fig. C)

Extend mounting bar to reach opposite joist and fasten in place. Adjust to desired position along mounting bar and lock in place.

hinged bar ends channel

tab

 

non-metallic

j-box cover

hinged

sheathed cable

 

(12 or 14

 

knock out

gauge only)

 

 

cable

 

 

clamp

 

 

 

junction box

Lightolier a Genlyte company

 

www.lightolier.com

631 Airport Road, Fall River, MA 02720 • (508) 679-8131 • Fax (508) 674-4710 We reserve the right to change details of design, materials and finish.

© 2005 Genlyte Group LLC • C1205

Page 1
Image 1
Lightolier 1104FESR instruction sheet Frame-In Wire-In, Frame-In Fig. a, Close-In Snap-On, For suspended ceilings