INSTALLATION OF PRE-WIRED CALCULITE FRAME-IN-KITS
A-LAMP WALL WASHER/DOWNLIGHT (Cent’d)
B. ADJUST MOUNTING FRAME
For both plaster or other dry ceiling installation, MOUNTING FRAME must be set so that the bottom edge is flush with the finished ceiling, as shown on Fig. 6.
NOTE: 1. To insure | proper installation, the | MOUNTING FRAME | FIG. 6 |
must always” | be” secure to structural | ceiling members. |
2.Final vertical adjustment can be made by means of MOUNTING BRACKET SCREWS (Fig. 2) on inside of
MOUNTING FRAME.
c.ADJUST SOCKET HOUSING
Engage SPRING to SLOTS for desired lamp/wattage position (see label on inside and outside of neck of REFLECTOFUHOUSING as shown on Fig. 7).
ADJUSTABLE SOCKET
HOUSING
SLOT
NOTE: To remove REFLE(70R/HOUSING for inspection and maintenance, push RETAINING SPRINGS outward and detach REFLECTOR/HOUSING from MOUNTING FRAME (See Fig. 1).
To insure neat installation, do not remove CARDBOARD PAINT SHIELD (provided) in MOUNTING FRAME (Fig. 1). The SHIELD will protect the inside of REFLECTOR/HOUSING from paint, pIaster and dust. Remove it only after construction is completed.
/RETAINING SPRINGS
FIG. 7
D. CARE AND MAINTENANCE OF “Al-ZAK”
REFLECTOR
If handling of reflectors with anodized or Alzak finish is required, the use of clean white or plastic film gloves recommended to avoid fingerprints.
Anodized or Alzak surfaces can be cleaned by the following methods:
1.Wipe off with a soft, clean, dry,
2.Wipe off with a soft clean cloth dampened in mild detergent solution. Rinse, then wipe dry with
3.Wipe off with a clean cloth dampened with a solution of wetting agent and water (such as 2 oz. per gallon “Pluronic