A-8

INSTALLATION

A-8

 

 

 

AUXILIARY POWER WHILE WELDING

Simultaneous welding and power loads are permitted by following Table I. The permissible currents shown assume that current is being drawn from either the 120V or 240V supply (not both at the same time). Also, the “Output Control” is set at “10” for maximum auxiliary power.

TABLE I

SIMULTANEOUS WELDING AND POWER

Output Selector

Permissible Power

Permissible Auxiliary

 

 

Setting

Watts (Unity Power

Current in Amperes

 

 

Factor)

@ 120V *-or- @ 240V

 

 

 

 

 

Max. Stick Setting

None

0

0

 

 

 

 

 

 

 

145

Stick Setting

3450

32**

16

 

 

 

 

 

 

 

90

Stick Setting

6000

50**

25

 

 

 

 

 

 

No Welding

9000

76**

38

 

 

 

 

 

 

 

*Each duplex receptacle is limited to 20 amps.

**Not to exceed 40A per 120VAC branch circuit when

Splitting the 240 VAC output.

STANDBY POWER CONNECTIONS

The EAGLE™ 10,000 Plus is suitable for temporary, standby, or emergency power using the engine manu- facturer’s recommended maintenance schedule.

The EAGLE™ 10,000 Plus can be permanently installed as a standby power unit for 240V-3 wire, sin- gle phase 38 ampere service.

WARNING

(Connections must be made by a licensed electri- cian who can determine how the 120/240V power can be adapted to the particular installation and comply with all applicable electrical codes.) The following information can be used as a guide by the electrician for most applications (refer also to the connection diagram shown in Figure 1.)

-------------------------------------------------------------------------

1.Install a double pole, double throw switch between the power company meter and the premises dis- connect.

Switch rating must be the same or greater than the customer’s premises disconnect and service over- current protection.

2.Take necessary steps to assure load is limited to the capacity of the EAGLE™10,000 Plus by installing a 40 amp 240V double pole circuit break- er. Maximum rated load for the 240V auxiliary is 38 amperes. Loading above 38 amperes will reduce output voltage below the allowable -10% of rated voltage which may damage appliances or other motor-driven equipment.

3.Install a 50 amp 120/240V plug (NEMA type 14-50) to the Double Pole Circuit Breaker using No. 8, 4 conductor cable of the desired length. (The 50 amp 120/240V plug is available in the optional plug kit.)

4.Plug this cable into the 50 amp 120/240V recepta- cle on the EAGLE™ 10,000 Plus case front.

EAGLE™ 10,000 PLUS

Page 15
Image 15
Lincoln Electric IM10028-B manual Auxiliary Power While Welding, Simultaneous Welding and Power, Standby Power Connections