A-6

INSTALLATION

A-6

 

 

 

POWER SOURCE TO LN-25™ PRO

CAbLE CONNECTION DIAGRAMS

ACROSS THE ARC SET-UPS

CCPower Sources with Output Terminals Always Hot (See Figure A.5)

CCPower Source Ranger 250, 250 LPG

Ranger 305G, 305D

 

 

 

Commander 300

 

 

 

 

FIGURE A.5

Vantage 300, 400, 500

 

 

 

 

 

 

Air Vantage 500

 

LN-25™ PRO

 

 

Ranger 10,000

Electrode

 

(Across the Arc)

 

 

Ranger 3 phase

 

 

 

SAE 400 with CV adapter

 

 

Work clip

 

 

 

Engine Driven welder with

Work

Wire Feed Module

 

 

 

If the power source has a Remote/Local switch, place the switch in the Local position.

Place the CV/CC switch in the feeder in the "CC" posi- tion.

CV Power Sources with Stud Connectors and Remote/Local Switch (See Figure A.6)

K#

Description

 

 

K2613-1

LN-25™ PRO

K2613-2

LN-25™ PRO Extra Torque

KP1695-XX

 

KP1696-XX

Drive Roll Kit

KP1697-XX

 

See Magnum Literature

Welding Gun

 

CC power Source

K1803-1

Welding Cables

FIGURE A.6

CV-655 DC-400 DC-600 DC-655 V450-Pro

Electrode

Work

LN-25™ PRO (Across the Arc)

Work clip

Place the power source Remote/Local switch in the Local position.

Place CV/CC switch in the feeder in the "CV" position.

K#

Description

 

 

K2613-1

LN-25™ PRO

K2613-2

LN-25™ PRO Extra Torque

KP1695-XX

 

KP1696-XX

Drive Roll Kit

KP1697-XX

 

See magnum Literature

Welding Gun

 

CV power Source

K1803-1

Welding Cables

 

 

LN-25™ PRO ACROSS THE ARC MODEL

Page 13
Image 13
Lincoln Electric IM901-A manual Across the ARC SET-UPS, Figure A.5