P 4/ 10

Repair

[3]DISASSEMBLY/ASSEMBLY

[3]-2. Switch lever, Lock off lever

DISASSEMBLING

(1)Remove Base from the machine by unscrewing M5x10 Thumb screw on the rear side and M5 (+) Pan head screw and M5-8 Hex nut on the front side. (Fig. 2)

(2)Remove Set plate, Water supply tank section and Handle (L) from the machine. Now, Lock off lever and Switch lever can be removed. (Fig. 5)

Fig. 5

1. Remove Set plate with small slotted screwdriver.

Handle (R)

Set plate

Handle (L)

Slotted screwdriver

2.Remove Water supply tank section

by unscrewing 4x20 Pan head screws (2pcs).

Water supply tank section

M4x20

Pan head screw

M4x20

Pan head screw

3.Remove Handle (L) from Handle (R) by unscrewing 4x18 Tapping screws (5pcs).

4x18 Tapping screw (5pcs.)

Handle (L)

4.Remove Lock off lever, Switch lever, Switch and other components such as Springs.

Handle (R)

Lock off lever

Switch lever

ASSEMBLING

(1)Assemble lock off lever and Switch lever to Handle (R). (Fig. 6)

Fig. 6

1.Mount Compression springs on an each projection of the two levers drawn below.

Be sure to seat the springs on the base of projection.

Note: Compression spring 4 for Lock off lever and for Switch lever are identical.

Lock off lever

Switch lever

Compression

spring 4

2.Set Lock off lever and Switch lever on Handle (R) along with Compression spring 4.

Lock off lever

Handle (R)

Compression

Compression

Compression

spring 4

Switch lever spring 4

spring 4

 

 

(2) Fasten Handle (L) to Handle (R) by screwing 4x18 Tapping screws (5pcs). (Fig. 5)

Page 4
Image 4
Makita CC300D (CC01*1) specifications Switch lever, Lock off lever