Manitowoc Ice Q-1300 Install additional insulation on entire suction line

Models: Q-1300

1 3
Download 3 pages 23.64 Kb
Page 3
Image 3
 9. Install additional insulation on entire suction  line

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background 9. Install additional insulation on entire suction Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background line

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background5. Install 3” x 3” insulation on

Q1300/Q1800

4. Apply bead of silicone before applying insulation

5. Align insulation slits with base ribbing

7. Seal insulation to base with silicone sealant

10.Insulate drain line

5.When installing in limited access areas, the insulation can be cut at the right TXV to allow installation of the bulkhead insulation in two pieces. Peel the white backing off of the insulation for the back bulkhead (9” x 48”). Align the slots in the insulation with the ridges in the base. Press the insulation against the bulkhead to secure. The insulation will overlap the left and right side insulation installed earlier. Position 3” x 3” square insulation on back bulkhead insulation, around the evaporator inlet and outlet tubing (four pieces total).

6.Peel the white backing off of the 3” x 48” strip of insulation and install over the bottom section of the 9” x 48” insulation installed in step 5. Align cut slots with the back bulkhead insulation and press to seal.

7.Use black silicone sealant to seal: insulation to the base, foam insulation to foam insulation joints, any voids where insulation meets or overlaps. Add bulkhead corner insulation covers where the rear bulkhead and side panel corners meet.

8.Verify no moisture is present in the suction line tubing. If moisture is present, drain and dry the insulation and reinstall.

9.Install armaflex insulation over the existing insulation on suction line. Use 3/4” x 3/8” insulation on the evaporator outlet and inlet tubing and 2” x 3/8” on the rest of the suction line. Use suitable glue to seal insulation airtight (do not use electrical tape). Seal the ends of the insulation with wire ties.

10.Remove clear vinyl tube from dump valve and brass wing adapter. Install armaflex insulation over tube and then reinstall tube to dump valve and adapter. Ensure white clamps are secure to prevent water from leaking.

8005483 Sheet 3 of 3 06/02/00

Page 3
Image 3
Manitowoc Ice Q-1300 installation instructions Install additional insulation on entire suction line