7.Peel evaporator insulation down to expose 3 bolts securing top cutter head - remove 3 bolts.
7.Use puller to remove cutter head from auger shaft. NOTE: If the bearing is destroyed or the auger heavily damaged from bearing wear contact the Manitowoc service department @
8.Install new cutter head and secure with three bolts removed in step 7. Use removable loctite on bolt threads.
9.Reassemble chute assembly and test run ice machine.
Manitowoc Foodservice |
|
2110 South 26th Street, P.O. Box 1720, Manitowoc, WI | 000004021 |
Telephone | Sheet 2 of 2 |
Web Site - www.manitowocice.com | 08/25/08 |
| Sheet 2 of 2 |