
5A. INSTALLATION INSTRUCTIONS 
Continue to lay the master panels. When 
cutting the master panels, mark the plate and 
saw it with EPS side up. You can use any 
saw with a fine-toothed metal blade. After 
cutting the panel, remove any burrs. When 
cutting the last master panel in the first row, 
use the rest of the panel to start the next 
row. This will provide staggered joints for the 
field panels. 
After completion of the panel installation in an area, use a vacuum to clean up thoroughly 
before installing the tubing. Dirt and debris in the tracks can create noise when the system is 
put into operation. 
5A 3