5
STEP 3 – Install Shelves
STEP 2 – Level the Stand
Stand Assembly
Carefully unpack the stand parts (see below) from the
packaging.
Tools Needed:
#2 phillips head screw driver • Level
Adjustable Wrench
Parts Quantity
AEnd Frame.......................................................................................................2
BLong Support Rail.......................................................................................4
CRear Leveling Legs (attached to end frames)..............................2
DShelves..............................................................................................................2
EPan-Head Screws.....................................................................................24
FLeft Side Panel (with hinge holes).....................................................1
GRight Side Panel (with no hinge holes)...........................................1
HBack Panel......................................................................................................1
IDoor....................................................................................................................1
JHinges (attached to the door)..............................................................2
KFront Foot.........................................................................................................2
LM5 x 16 Hex-Phillips Head Cap Screw -
5
8
” (16mm) long....6
MFront Foot Leveling Head........................................................................2
NFlat Head Screws.........................................................................................6
FF M5 x 20 Hex-Phillips Head Cap Screw -
3
4
” (20mm) long....2
C
STEP 1 – Assemble Frame of Stand
A
B
K
M
Lx 3 K/M