1)To facilitate proper air circulation, the cooler should not be installed in any enclosed or confined space.
2)Prior to installation, remove back cover of cooler and visually inspect for transit damage. Temporarily connect cooler to electric supply and switch on the thermostat. Check that fan is operating and not jammed.
3)For installation, connect the water inlet and wastewater drain connections. Do not use excessive force on the brass inlet and drain connectors of the cooler, as this tends to damage it.
4)Connect
5)Always use a proper circuit breaker to avoid compressor burnout.
Automatic voltage stabilizer should be used in low voltage areas.
Specifications
Cabinet
Made of heavy gauge
Refrigeration System
Fitted with world renowned, high starting torque, high temperature compressors. Condenser and fan are slightly oversized to ensure efficient working in high temperatures. Copper cooling coil metal bonded to outside of water tank. Whole system hermetically sealed with
Water System
All copper / brass water system. Water tank made of heavy gauge copper sheet tinned from inside. Tank safety tested at 10 kg/cm2 (142 p.s.i.) with recommended maximum working pressure of 5 kg/cm2 (71 p.s.i.). Fitted with high quality chrome plated brass taps.
Insulation
Moisture proof and highly effective polyurethane or polystyrene insulation.