WARNING
This unit must be plugged into the proper voltage which is
specified on the data plate located on the back panel of this unit. Use of any other voltage or altering of plug will damage unit, void warranty and may cause injury.
BEFORE INSTALLATION
NOTE: Upon receipt of this unit, immediately unpack and inspect for possible concealed shipping damage. If unit is found to be damaged, save all packing materials and contact your delivery carrier within 5 days. Refer to “Shipping Damage Instructions” enclosed for detailed instructions. Failure to follow these instructions will negate Merco/Savory’s or your ability to file claims and receive compensation for shipping damage.
INSTALLATION INSTRUCTIONS
Install
Receiving Pan/Delivery Chute Installation: as the receiving pan is installed first. Tilt the pan so that the back end slides along the bottom of the opening and passes under and behind the two pins (Figure B). With the pan resting flatly on the bottom of opening, gently pull toward you until back is stopped by the pins (Figure C). The delivery chute should now be installed through the same opening. Hold the delivery chute so that the notches are closest to you and down. Insert the chute into the cavity up and over the pins until the notches rest directly on the pins. The other end of the delivery chute will rest on the motor housing at the rear of the toaster cavity (Figure D).
Loading Ramp Installation: Locate the two protruding pins on the toaster (one on each side of the front portion of the toaster). Position the loading ramp so that the notches on the ramp slide over these pins and lock into place (Figure E).
2