MAINTENANCE
ONE PART GLUE (EMERGENCY REPAIRS ONLY)
Follow the directions on the cement tube.
TWO PART ADHESIVE
Mix a batch of adhesive according to the mixing directions provided with the two part adhesive. Keep adhesive off skin. When the adhesive is fully mixed, it must sit for a short time to activate the catalyst. Failure to do so will create poor fabric adhesion.
Apply three thin layers of adhesive with a short bristle brush, in a circular pattern on both the backside of the patch and the patch area on the boat. Allow each layer to dry for 5‑10 minutes before applying the next layer. After applying the third layer, wait 5‑10 minutes and then apply the patch to the prepared area and press down firmly. Using a smooth object (a back of a tablespoon works well), force out any air bubbles that may have been trapped under the patch, working from the center of the patch to the outside.
After removing the masking tape, place a 4‑5 pound weight onto the patch and allow 24 hours drying time before pressurizing the repaired air chamber.
31