FollowInstallationthe simple steps outlined in this section ofGuidethe guide to install and start using your Metrobility “twister”.
Unpack the “twister” and Accessories
Check that the following components have been included:
•Metrobility “twister”
•Power supply
•Power cord
•Four (4) rubber feet
Your order has been provided with the safest possible packaging, but shipping damage does occasionally occur. Inspect your order carefully. If you discover any shipping damage, notify your carrier and follow their instructions for damage and claims. Save the original shipping carton in case return or storage of the unit is necessary.
Choose an Appropriate Location
2The “twister” is intended for use in either office or industrial environments. The unit must be located within six (6) feet of the AC power source being used and placed as far away as possible from electrical noise generating equipment such as copiers, electrostatic printers and other motorized equipment. If exposed
The unit may be oriented in any manner which allows you to make physical connection to the power supply and leaves a minimum of six (6) inches of space for proper ventilation.
3Set the DIP Switches
The Metrobility “twister” includes a set of six DIP switches located on the back of the unit. (See figure below.) These switches are used to enable/ disable functions and are clearly marked. Unmarked switches are nonfunc- tional. LLR1 controls Link Loss Return on Port 1. LLR2 controls Link Loss Return on Port 2. LLCF sets Link Loss Carry Forward on the fiber-