Installation

Direct wall connection

Dryer side view

Necessary materials:

– a wall pipe

– flexible foam gasket

Dryer top view

1 Wall pipe

2 Flexible foam gasket

1 Wall pipe

2 Flexible foam gasket

^ Connect the flexible foam gasket, 2, to the wall pipe connector, 1.

^ Push the dryer to the wall.

30

Page 34
Image 34
Miele T1405, T 1405 operating instructions Direct wall connection, Dryer top view