![](/images/new-backgrounds/1328490/32849029x1.webp)
2-4. Installing Work Clamp
1 | 1 | Insulator | |
2 | Bolt | ||
| |||
| 3 | Smaller Hole | |
| 4 | Work Clamp Tabs | |
| Bend tabs around work cable. | ||
6 | 5 | Work Cable From Unit | |
2 | Nut | ||
| 6 |
Tools Needed: | 5 |
| |
| 3 |
3/8, 7/16 in | 4 |
|
Ref.
2-5. Installing Gas Supply
1
2
3
Argon Gas
Obtain gas cylinder and chain to running gear, wall, or other station- ary support so cylinder cannot fall and break off valve.
1Cap
2Cylinder Valve
Remove cap, stand to side of valve, and open valve slightly. Gas flow blows dust and dirt from valve. Close valve.
3Cylinder
4Regulator/Flowmeter
Install so face is vertical.
5 Gas Hose Connection
Fitting has
6 Flow Adjust
Typical flow rate is 20 cfh (cubic feet per hour). Check wire manufactur- er’s recommended flow rate.
7CO2 Adapter
8
Install adapter with
6 | OR |
5 | 1 |
| |
| 4 |
| 2 |
Tools Needed:
3
7 8
5/8,
CO2 Gas
ssb3.1* 12/92 –