IMPORTANT: If cooling system has mounting holes in base, do not install mounting brackets onto SWINGPAK locker. Instead, install coolant system directly onto lock- er using supplied hardware.

7.If applicable, install grid onto SWINGPAK locker using supplied 1/4-20 x 1 inch cap screws (Item 7, Figure 4-1) and associated hardware.

8.If applicable, install gas cylinder support bracket onto SWINGPAK locker using supplied 5/16-18 x 3/4 inch self-threading screws (item 12, Figure 4-1).

9.Install cylinder support bracket to SWINGPAK locker using supplied 1/4-20 x 1 inch cap screws and associated hardware. Secure gas cylinder in bracket using supplied cylinder chain.

10.If applicable, install disconnect switch mounting brackets onto disconnect switch (customer must supply mounting hardware).

WARNING: ELECTRIC SHOCK can kill.

Do not touch live electrical parts.

Be sure input power is disconnected and welding power source is shut down before making connections to disconnect switch.

11.Install disconnect switch onto boom support, and secure using supplied disconnect switch mount- ing clamps (Item 2, Figure 4-1) and 3/8-16 nuts (Item 5) and associated hardware.

12.Make electrical input connections from welding power source to disconnect switch according to welding power source Owner’s Manual.

13.To make electrical connections from line discon- nect switch to source of input power, consult local electric utility or certified electrician.

OM-1102 Page 3

Page 7
Image 7
Miller Electric OM-1102 manual