7
Lift mounting neck to mounting Plate and align screws.
10
Install yoke cover to downrod.
13
Insert cotter pin in to cross pin to secure.
16
8
Secure mounting neck to the mounting plate with four screws to become a complete mount- ing bracket.
11
Thread leadwire and safety cable through downrod.
14
Tighten yoke set screws securely and evenly.
17 Safety cable installation
Safety Cable
Lag Screw
For Canadian installation and for USA fan and light kit combinations over 35 lbs, in both flush and downrod mode the safety cable must be installed into the house structure beams using the 3” lag screws provided. Make sure that when the safety cable is fully extended the leadwires are longer than the cable and no stress is placed on the leadwires.
9
Install canopy to downrod.
12
Loosen the 2 set screws in the yoke. Insert downrod into yoke, aligning hole large hole in the downrod with the large hole in the yoke. Insert cross pin though yoke and downrod.
15
Hang assembled fan from the mounting bracket installed to ceiling in previous step. Make sure the fan is hanging straight. Rotate fan until the tab on the Mounting bracket engages the slot on the Downrod Ball. This must be done to prevent the fan body from rotating when the blades are in motion.
18
Make wire connections to power source using wire nuts provided. Make sure that no filiments are outside of the wirenut. After making the wire connections, the wires should be spread apart with the grounded conductor and the