Moyer Diebel DF2-M6, DF-M6, DF1-M6 technical manual Installation, Unpacking

Models: DF2-M6 DF1-M6 DF-M6

1 46
Download 46 pages 1.73 Kb
Page 8
Image 8
INSTALLATION

INSTALLATION

Unpacking

1.Remove the packing from the top of the conveyor stack.

2.Remove all packing from glass operated switch and right and left trays. Check that the right and left hand trays are positioned properly.

3.Check that the drain deflector is secure in the rinse drain.

4.Check the position of the splash curtain.

5.Check that the conveyor is level and the drive gear is engaged in the conveyor’s outer rim grooves.

6.Remove the packing from within and above the detergent tank.

7.Ensure the standpipe is in position in the detergent tank.

NOTE:

The standpipe is located inside the wash return screen for shipping.

8.Ensure that the wash return screen in the detergent tank is in position.

9.Check that the lower drain screen is in postion.

SPLASH CURTAIN

4

3

1

25

8

7

DETERGENT

9

TANK

Figure 1 — Unpacking Parts

6

Page 8
Image 8
Moyer Diebel DF2-M6, DF-M6, DF1-M6 technical manual Installation, Unpacking