NOTE: Assembly of this heater requires
basic mechanical skills. Proper assembly
is the responsibility of the installer.
Step 3 ---- Attach Head Assembly to Post
Load head assembly by inserting gas hose into post.
Insert head assembly into post.
Tighten securely using M4 X 8 Bolts (5 pcs) and 4mm washers (5 pcs).
Step4 ---- Attach Double Threaded Bolts to
Head Assembly
Attach M6 X 70 double threaded bolts (3 pcs) and 6mm washers (3 pcs) to the top of head assembly and tighten the bolts securely.
ASSEMBLY
Step 3
3
4 | 13 |
| 12 |
5
Step 4
10
16
3
7