Figure 3-1. RJ-45 Connections

Equipment Checklist

After unpacking this switch, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.

Package Contents

Stackable Fast Ethernet Switch (MR2228-S2C)

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and eight screws for attaching the brackets to the switch

Power Cord—either US, Continental Europe or UK

RS-232 console cable

This Installation Guide

Management Guide

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)

Mounting

This switch can be mounted in a standard 19-inch equipment rack or on a desktop or shelf. Mounting instructions for each type of site follow.

14

Page 18
Image 18
MRV Communications MR2228-S2C manual Equipment Checklist, Package Contents, Optional Rack-Mounting Equipment