GA-9.7 HZ — OPERATING INSTRUCTIONS

Before Starting

1.Be sure to disconnect the electrical load and switch the main circuit breaker to the “OFF” position prior to starting the engine.

2.Never start the engine with the main circuit breaker “ON”.

3.Check the lubricating oil level prior to starting the engine. Make sure the generator is level. The oil level must be maintained between two notches on the dipstick.

4.When there is not enough lubricating oil, fill the crankcase with high grade motor oil. Use a high quality detergent oil classified SC, SD or SE. (See Table 3 on page 13)

CAUTION:

λNEVER start the engine when the oil level is below the lower mark on the dipstick.

λCheck the fuel level on the fuel gauge. When fuel is low, fill the fuel tank with clean fresh unleaded automotive gasoline.

λIf gasoline spillage occurs, completely wipe up the spilled gasoline.

Starting

1.Place the idle control switch in the “ON” (up) position.

2.Close the choke. Adjust the opening of the choke valve according to operating conditions. When the engine is warm or the air temperature is high, close the choke valve halfway or open it all the way.

3.Confirm that the main circuit breaker on the generator control box is “OFF”.

4.Set the operation switch to the “ON” position and grasp the starting rope and slowly pull it out. The resistance becomes hardest at a certain position, corresponding to the compression point. Rewind the rope a little from that point and pull out sharply.

5.If the engine fails to start, repeat the procedure.

CAUTION:

λDO NOT pull the starter rope all the way to the end.

λDO NOT release the starter rope after pulling. Allow it to rewind as soon as possible.

Warm up

1.When the engine starts, open the choke slowly.

2.Run the engine at low speed for 3 minutes without load until the engine warms up.

3.Turn the idle control switch to the "OFF" (down) position and check the voltage by referring to the voltmeter on the control box.

CAUTION:

DO NOT change the engine speed control lever which has been set at the factory prior to shipping.

1.Check the generator for abnormal noise and smells.Then connect the load to the receptacles of the generator.

2.Switch the main circuit breaker to the “ON” position and turn the idle control switch to the “ON” (down) position for normal (load) engine operation.

Operation

Check the voltage by referring to the voltmeter on the control box. When the voltmeter indicates 120 volts, 120 volts from the 120V receptacles and 240 volts from the 240V receptacle can be obtained at the same time. Refer to Figure 1, Controls and Indicators, item 4 on page 10.

Stopping the Engine

CAUTION:

NEVER stop the engine suddenly while running at high speeds.

1.Remove the load from the generator. Place the circuit breaker in the “OFF” position. Refer to Figure 1, item 5 on page 10. Run the engine (no-load) with the idle control switch set to the ON position for three to five minutes, then stop the engine.

2.Turn the START/STOP switch to the “STOP” position.

3.Never stop the engine suddenly while running at high speed.

PAGE 16 — GA-9.7 HZ A.C. GENERATOR— PARTS & OPERATION MANUAL — REV. #2 (03/05/01)

Page 16
Image 16
Multiquip GA-9.7 HZ operation manual Before Starting, Warm up, Operation, Stopping the Engine

GA-9.7 HZ specifications

The Multiquip GA-9.7 HZ is a cutting-edge generator known for its reliability and versatile performance, making it ideal for both residential and commercial applications. This generator is engineered to deliver powerful and consistent electrical output, particularly when high performance is necessary. The GA-9.7 HZ stands out due to its robust design, advanced technologies, and user-friendly features, catering to the needs of professionals and DIY enthusiasts alike.

One of the main features of the GA-9.7 HZ is its reliable Honda GX series engine. This engine is designed for efficiency and durability, ensuring that the generator runs smoothly under varying loads. The Honda engine is complimented by an air-cooled, 4-stroke design, which significantly reduces fuel consumption while providing superior power output. With a maximum output of 9.7 kVA, the GA-9.7 HZ can easily handle the electrical demands of construction sites, outdoor events, and backup power for homes.

The generator is equipped with an automatic voltage regulator (AVR) that ensures stable voltage output. This technology is crucial for protecting sensitive electronic devices and machinery from voltage fluctuations, making the GA-9.7 HZ a dependable choice for powering essential equipment. Moreover, it features low oil shutdown, which automatically turns off the engine when oil levels drop too low, preventing potential engine damage and prolonging the lifespan of the generator.

In terms of usability, the GA-9.7 HZ is designed with convenience in mind. It features a user-friendly control panel with easy-to-read gauges, allowing operators to monitor runtime hours and voltage output at a glance. The generator is also equipped with multiple outlet options, including 120V and 240V receptacles, providing flexibility for various applications. Additionally, the generator's compact size and lightweight design make it portable and easy to transport, ensuring that it can be used in multiple locations with ease.

Durability is another hallmark of the GA-9.7 HZ. Its sturdy frame and high-quality components are designed to withstand challenging conditions often encountered on job sites. The weather-resistant enclosure further enhances its durability, allowing it to perform in diverse weather environments.

In summary, the Multiquip GA-9.7 HZ combines a powerful Honda engine, advanced technology such as AVR, and user-friendly features to create a robust and reliable generator. Its performance, portability, and durability make it an excellent choice for anyone in need of trusted power solutions.