Multiquip Qp-2TE manual QP- 2TE - PREPARATION FOR LONG -TERMSTORAGE, Pump Storage

Models: Qp-2TE

1 58
Download 58 pages 25.37 Kb
Page 26
Image 26
QP- 2TE — PREPARATION FOR LONG -TERM STORAGE

QP- 2TE — PREPARATION FOR LONG -TERM STORAGE

Pump Storage

For storage of the pump for over 30 days, the following is required:

Drain the fuel tank completely.

Run the engine until the fuel in the injection system is completely consumed.

Completely drain used oil from the engine crankcase and fill with fresh clean oil, then follow the procedures described in the engine manual for engine storage.

Remove the drain plug from the pump and drain out any water left in the housing.

Remove the pump cover and clean the inside of pump housing. Coat the inside of pump housing with a light film of oil to reduce corrosion. A spray can of oil works well for this application.

Cover suction and discharge ports with duct tape to prevent any foreign matter from falling into pump.

Cover pump and engine with plastic covering or equivalent and store in a clean, dry place.

To protect the water cooled-seals, place one-half pint of lubricating oil (new or used) through the discharge opening on the pump and crank the engine several times. This will prevent excessive corrosion and also keep the mechanical seal lubricated.

PAGE 26 — QP- 2TE TRASH PUMP — OPERATION AND PARTS MANUAL — REV. #1 (08/10/10)

Page 26
Image 26
Multiquip Qp-2TE manual QP- 2TE - PREPARATION FOR LONG -TERMSTORAGE, Pump Storage