WIRING
CAUTION: PERFORM THE WIRING OPERATION WITH THE POWER SOURCE “OFF”
1.Connect terminal 5 on the HD9063 to engine ground and connect terminal 4 to battery positive (see Figure 3).
2.Connect the magnetic pickup cable conductors to terminals 6 and 7.
3.If cable is shielded, connect shield to engine chassis ground.
4.If desired, connect a normally open test push button switch between terminals 8 and 9.
5.Connect crank disconnect circuit to crank disconnect termi- nals 1 thru 3 as discussed in Crank Disconnect Relay Function, page 2. On
6.Connect the overspeed circuits to overspeed terminals 10 thru 12 as discussed in Overspeed Relay and Underspeed Relay Function, page 2.
|
|
|
| (+) ( ) (+) ( ) |
|
|
|
| |||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 11 12 |
|
| K1 |
|
|
|
|
|
|
|
| K2 |
|
|
|
|
|
|
|
|
|
|
| 12 |
|
To Engine | Common |
|
|
|
|
|
|
|
| Common |
|
Crank Control |
|
|
|
|
|
|
|
| To | ||
Circuit | Normally Open |
|
|
|
|
|
|
|
| Normally Open | |
or |
|
|
|
|
|
|
|
| Shutdown | ||
to Shutdown | Normally Closed |
|
|
|
|
|
|
| Normally Closed | Circuits | |
Circuits |
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| Test |
| |
|
|
|
|
|
|
|
|
|
| Pushbutton |
|
DC Positive
DC Negative
(Engine Ground)
From Magnetic Pickup
Figure 3
MAGNETIC PICKUP INSTALLATION
A magnetic pickup is an AC generator. It is normally installed into the flywheel housing of an internal combustion engine, so that the starter ring gear acts upon it to generate a voltage pulse each time a gear tooth passes the end of the sensor.
Magnetic Pickup Installation (see Figure 5)
Drill and tap a hole in the flywheel housing (See Specifications Chart below for model and thread size). IMPORTANT: Drilling too deep may damage ring gear teeth. Blow chips with air hose when drilling and tapping hole.
Gap Adjustment
Insert magnetic pickup and turn until it stops at the face of the gear. | |||||
|
|
| |||
wise 1/4, 1/2, or 3/4 turn (Figure 4) . |
|
|
|
|
|
See Gap Chart (above, right) to determine gap | 1/4 |
|
|
| |
|
|
| |||
distance based on the turn. Check gap clear- |
|
|
| ||
|
|
|
|
| |
ance by rotating the gear completely around. |
|
|
|
|
|
|
|
|
|
| |
NOTE: Magnetic pickup gap should be | 1/2 |
| 3/4 | ||
adjusted so that the minimum voltage required |
| ||||
|
|
|
|
| |
|
|
|
|
| |
is attained at the engine’s lowest RPM. The |
|
|
|
|
|
voltage will increase as the speed increases. |
|
|
|
|
|
|
| Figure 4 | |||
If erratic readings occur, remove magnetic |
|
| |||
|
|
|
|
| |
|
|
|
|
| |
pickup and check the magnetic tip for metal chips. |
|
|
|
Murphy Magnetic Pickup Specifications Chart
Pickup | Total | Threaded | Thread |
Model | Length | Length | Size |
MP3298* | 3 in. (76 mm) | 3 in. (76 mm) |
|
MP7906† | 3 in. (76 mm) | 3 in. (76 mm) |
|
MP7905†† |
|
*Replaces 20-01-0080 and MP100. Lead wire hookup (12 in. [305 mm]).
†Replaces
Gap Chart
THREAD | 1/4 | TURN |
|
|
| |
SIZE | 1/2 | 3/4 | 1 |
| ||
.013 in. | .028 in. | .035 in. | .055 in. | G | ||
(0.33 mm) | (0.71 mm) | (0.88 mm) | (1.39 mm) | |||
| ||||||
.015 in. | .030 in. | .045 in. | .062 in. | A P | ||
(0.38 mm) | (0.76 mm) | (1.14 mm) | (1.57 mm) |
| ||
|
| |||||
| Always use a |
| ||||
| shield to a metal frame ground at the engine end only. |
| ||||
Never run these wires |
|
|
|
| ||
next to spark plug wires |
|
|
|
| ||
or in wire loom with other |
|
|
|
| ||
wires carrying inductive |
|
|
|
| ||
loads or alternating current. |
|
|
|
| ||
After adjusting, |
|
|
|
| ||
set locknut. |
|
|
|
| ||
Drill and tap casing |
|
| AC |
| ||
(see thread sizes in |
|
|
| |||
Specifications). |
|
| Meter | |||
|
|
|
| |||
| Gap |
|
|
|
| |
| (see Gap Chart) |
| Casing |
|
|
NOTE: Clean gear casing | Gear (must be made | |
of magnetic material). | ||
and magnetic sensor | ||
| ||
of metal chips or filings. |
|
Figure 5