3. INSTALLATION PROCEDURE
The flowchart in Figure 3-2 shows the installation procedure. Each step is assigned a NAP number. NAPs NAP-
200-001 through NAP-200-018 follow Figure 3-2. These NAPs should be followed sequentially when perform-
ing the installation. Individual steps, such as installation of SMDR, can be performed independently by referring
to the corresponding NAP.
Figure 3-2 Installation Procedure
START
Installation Preparation
Marking, Leveling, and Drilling
Unpacking and Inspection
Power Equipment Installation
MDF Installation Base Unit Installation
Mounting of Units and Modules
Cable Running
Cable Termination
Cable Termination and Cross
Connection
Power and Ground Cables
Circuit Cards Setting
Cable Connections
Circuit Cards
Desk Console Setting
MAT Setting
Connection of SMDR
Cleaning and Visual Check
END
Front Cable Connections between
(NAP-200-006)
(NAP-200-003)
(NAP-200-002)
(NAP-200-001)
(NAP-200-004)
(NAP-200-005)
(NAP-200-008)
(NAP-200-009)
(NAP-200-010)
(NAP-200-012)
(NAP-200-016)
(NAP-200-017)
(NAP-200-018)
(NAP-200-015)
(NAP-200-014)
(NAP-200-013)
(NAP-200-007)
Inter-Frame Cable Connections
(NAP-200-011)
(PBX->MDF/ATTCON/MAT/SMDR)
(MDF->C.O. Lines/Tie Lines/
Peripheral Equipment)
Connection
Internal Cable Connections